Turner Valley Compressor Station
The Turner Valley Compressor Station Unit Addition involved the installation of a single 30MW turbo-compressor package (gas turbine and compressor) and tie-into existing NPS 48, yard piping located in South Western Alberta. Construction included installation of Auxiliary Power Unit, Primary Power Unit, Mechanical Building containing a glycol heating boiler system, Instrument Air Building, Electrical Building – Motor Control System and Uninterruptible Power System, Yard Piping, Utilities and Control Buildings including Emergency Shutdown System (ESD) and Programmable Logic Control (PLC). The project was safely and successfully completed from Q2-2019 to Q2-2020 on time and on budget.
Scope of this project
30MW GE Compressor/Turbine
Structural & Piping fabrication, Civil, Structural, Mechanical, Coating, Insulation Electrical, & Instrumentation including commissioning support
All-terrain Cranes up to 500 tons, Heavy Earthworks Equipment (Hoes, dozers, excavators & rock trucks).